On January 24, 2025, the Oriental Square Grade A office building, developed by OSI Holdings, is in the construction phase, focusing on the columns and walls of the 8th floor, and the beams/slabs of the 9th, 10th, and 11th floors, as well as the technical floor.
On January 11, 2025, the Oriental Square Grade A office building, developed by OSI Holdings, is in the construction phase, focusing on the columns and walls of the 8th floor, and the beams/slabs of the 7th, 8th, and 9th floors, as well as the technical floor.
On January 4, 2025, Oriental Square by OSI is in the construction phase, focusing on the columns and walls from floors 1 to 4, floor 5, and beams/slabs for floors 2, 3, and 4, as well as the technical floor